|
Practical Operation Picture |
Tools / files |
Procedure Explaination |
|
|
Coating-Long Quality Control Test Form
(electroplating) OXFORD INSTRUMENTS |
CMI 700 |
After Customer’s semi-manufactured goods (electroplating) enter our factory, we examine the surface condition of screw electroplating immediately(coating smooth degree, adhesive force, clean degree, coating thickness measurement) ,we record it on quality control examination form. ( Electroplating) |
|
|
Coating-Long Quality Control Examination Form (Finished Products) |
Electric Drilling Machine,Customer’s Examination Standard. |
After finishing the product, we examine its surface condition (hues, stuffing porosity). If the hardness and thickness of inner coating layer is required, we use electric drilling machine and customer’s examination standard for checking, we record the result on Coating-Long quality control examination form. ( Finished Products) |
|
<next> |
|
|
|
|
集偉工業股份有限公司JYI WOEI INDUSTRIAL CO., LTD. |
|
|
|
高雄縣路竹鄉復興路300號
300 Fu-Hsing Road, Lu-Chu Hsiang, Kaohsiung Hsien, Taiwan, R.O.C.
TEL:886-7-6964376 FAX:886-7-6966021
E-mail:mail@arphar.com |
|
|
|
|